A technical report is strongest inside its defined property and effective date.
Nzega–Buckreef District
The Nzega–Buckreef report uses the Buckreef project as a dated technical reference for greenstone exploration, drilling, metallurgy and resource reporting. It separates project disclosure from the wider district so that historical mines, current projects and untested licences are not combined into one prospectivity claim.
Updated: 2026-08-13
Geology, drilling, metallurgy and resource classification are separate evidence domains.
Historical mine status must not be presented as a current fact.
Report overview
District and project setting
Buckreef is situated in the Lake Victoria Goldfields within an Archaean greenstone framework. The 2025 technical report provides a property-specific synthesis of tenure, geology, sampling, drilling, metallurgy and resource work.
That detailed evidence is valuable as a method reference, but the property boundary remains a hard applicability limit. The wider Nzega district requires independent source and field control.
Continue with the member report
Sign in or become a member to read the complete interpretation, exploration workflow and full source register.
Sign inReferences and source boundaries
Buckreef Gold Mine Project — NI 43-101 Preliminary Economic Assessment and Updated Mineral Resource Estimate
- Used for
- Current dated project technical reference.
- Limit
- Property-specific technical report; retain its assumptions, classifications and effective date.
Historical Buckreef technical report
- Used for
- Historical Lake Victoria and property geology context.
- Limit
- Superseded for current estimates and project status.
Geology and Minerals Potential in Tanzania
- Used for
- National geological context.
- Limit
- Does not define property resources.
GLEAN GOLD bilingual regional synthesis — source-linked, non-independent and not a mineral resource or reserve statement.
Regional reference only. This report does not establish mineralisation, resources, reserves, title status or investment value for any licence. Project conclusions require verified field observations, structural measurements, representative assays and QA/QC.
